RCC Road Paving - Indira Dock, Bombay Port Trust
Project Overview: The project includes the installation of R.C.C. roads and pavements at Indira Dock.
Its objective is to boost roadway durability to endure heavy loads and sustained traffic. This enhancement will streamline the movement of goods and equipment, thereby improving the efficiency of the dock's transportation infrastructure.
Project Details:
- Location: Indira Dock
- Scope of Work:
- Road Construction: Building new reinforced concrete roads & pavements to replace or supplement existing roadways.
- Reinforcement: Utilizing high-grade materials to ensure the roads can withstand heavy and continuous traffic.
- Materials Used: High-strength reinforced concrete, known for its durability and ability to handle substantial weight.
Benefits:
- Enhanced Durability: Reinforced concrete provides a solid and enduring roadway surface, reducing the need for frequent repairs.
- Increased Load Capacity: The new roads are designed to support the heavy loads typical of dock operations, ensuring smoother logistics and transportation.
- Improved Efficiency: Better roads lead to more efficient movement of goods and vehicles within the dock area, facilitating quicker turnaround times.
Key Highlights:
- Long-Lasting Infrastructure: The use of reinforced concrete ensures the roads will have a longer lifespan and require less maintenance.
- Operational Efficiency: Improved roads contribute to the overall efficiency of dock operations, benefiting both workers and businesses relying on the dock.

Location
Mumbai
Department
M.B.P.T., MUMBAI.
01 / 0